TTS Homepage TTS Troughing Systems TTS Solutions TTS Green Trough Installations TTS Green Trough - News & Exhibitions Contact TTS Rail (Trough-TEC Sytems)  
 
 
TTS Rail - Green Trough Installations
Aquarius Demonstration
Red Viking Rail
ABB UK Power Networks
Elevated TTS Troughing at Thirsk
 
 
 
 
 

 

 

From enquiry to design and installation in under two weeks.

TTS Rail were approached by Red Viking Rail to help with a significant cable management problem at a site in Doncaster. Red Viking were contracted by Volker Fitzpatrick to introduce an Under Track Crossing (UTX) at the entrance to the new Hitachi Stabling Facilities off the East Coast Mainline.

Kevin Slater of Red Viking asked TTS to see what options we could offer to solve the complex challenge, as a significant volume and array of cables (with varying degrees of slack and excess) needed to be housed at the exit of the UTX.

A site visit in March 2015 led to the TTS Rail design team developing a bespoke solution which was presented to the client. A speedy acceptance of the design led to the installation being completed in under two weeks from the initial enquiry.

For more information call Gary Elliott.

 
 
 
 
 



 
   
TTS Rail Twitter
 
 

 

 

 

 

 

 

TTS Rail Limited

Clifford House
Lady Bank Drive
Lakeside
Doncaster
DN4 5NF

Phone +44 (0)1302 343 633

 

 
Got an enquiry for TTS Rail? Email link. Got an enquiry for TTS Rail? Email link.